We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/General Science/Hydroelectric Power Generation System in Tanggari (PLTA Tanggari 2)

Checking your access to this record.

Abstract & Overview

The research objective of PLTA Tanggari 2 is to understand and analyze the hydropower system from energy generation to distribution to end consumers, both households and industries. This research aims to improve the efficiency and performance of the entire electricity generation and distribution system. The research methodology used in making this journal is to collect sources or information related to the topic of discussion, namely hydroelectric power plants. The study explores the utilization of hydropower in the Tondano watershed to address electricity needs in North Sulawesi. Tanggari 2 Hydropower Plant exemplifies this by harnessing the potential and kinetic energy of water through a dam on the Tondano River. With an extensive watershed area of 4,700 hectares and Lake Tondano at its core, this system is optimized to efficiently generate electricity for the entire region. The input-output dynamics of hydropower plants are crucial, detailing how water flow drives turbines, ultimately leading to electrical output. This research underscores the potential of watershed utilization as an accessible, economical, and sustainable energy source for broader regional electrification endeavors. The implications of this research extend to enhancing understanding and analysis of water-based power generation systems, from energy production to distribution to end consumers. By improving the efficiency and performance of these systems, there is a significant potential for sustainable energy solutions that can benefit both households and industries in the broader regional context of North Sulawesi.

Cite this record

Deitje Sofie Pongoh, Johan Pongoh, Jusuf Luther Mappadang, Samuel Mandagi, Teovano Ante, Dina Ardiani, et al. (2024). Hydroelectric Power Generation System in Tanggari (PLTA Tanggari 2). Interdisciplinary Journal of Advanced Research and Innovation, 2(4). https://doi.org/10.58860/ijari.v2i4.58

Copy in another style

Pongoh, D. S., Pongoh, J., Mappadang, J. L., Mandagi, S., Ante, T., Ardiani, D., Sondakh, Y., & Monopode, A. (2024). Hydroelectric Power Generation System in Tanggari (PLTA Tanggari 2). Interdisciplinary Journal of Advanced Research and Innovation, 2(4). https://doi.org/10.58860/ijari.v2i4.58
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.