Abstract & Overview
Costs of surface mining unit operations are controlled by rock fragmentation distribution.The costs can be reduced if the muck pile does not contain oversize fragments which require crushing and grinding.The oversize fragments can be reduced by adjusting the surface mine blast design so that their number in the muck pile is minimum.This paper explains the application of the Artificial Neural Network (ANN) for the minimisation of oversize fragments so that overall cost is minimum.It was observed that the trained neural network model estimated the boulder count with sufficient accuracy and it provides a feasible choice to the field engineers to optimize the blast design so that the boulder-count is the minimum and subsequently the improving the efficiency of downstream operations and their costs