Home/e-Resources/Civil & Construction Engineering/Construction Delays in Developing Countries: A Review
PeriodicalsCivil & Construction Engineering

Construction Delays in Developing Countries: A Review

Checking your access to this record.

Abstract & Overview

Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors' cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.

Cite this record

Muhammad Saiful Islam, Bambang Trigunarsyah (2017). Construction Delays in Developing Countries: A Review. Journal of Construction Engineering and Project Management, 7(1), 1–12. https://doi.org/10.6106/jcepm.2017.3.30.001

Copy in another style

Islam, M. S., & Trigunarsyah, B. (2017). Construction Delays in Developing Countries: A Review. Journal of Construction Engineering and Project Management, 7(1), 1–12. https://doi.org/10.6106/jcepm.2017.3.30.001
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.