Abstract & Overview
Studi ini bertujuan merencanakan besarnya dimensi, jumlah dan penempatan kolam retensi yang akan direncanakan di Kecamatan Oebobo-Kota Kupang. Metode yang digunakan Metode Gumbel Tipe I dan Log Pearson Tipe III dan Metode Rasional. Dari penelitian ini diperoleh besarnya curah hujan rencana dengan kala ulang 10 tahun (R10) menggunakan Metode Gumbel Tipe I sebesar 159,142 mm dan besarnya R10 menggunakan Metode Log Person Tipe III dsebesar 147,178 mm dan Uji Kecocokan Chi-Kuadrat dan Smirnov-Kolmogorov diterima (Dmax QS=6,070 m3/dtk, maka didapat total volume air sebesar 3.132,3536 m3 yang dipakai untuk merencanakan tipe kolam retensi penampungan memanjang, dengan dimensi, yaitu: lebar kolam (Bkolam) = 4,00 m dan kedalaman (Dkolam) = 1,50 m, maka didapat panjang kolam (Lkolam) = 522,00 m. Konstruksi kolam retensi dilengkapi dengan bendung, dimana tinggi bendung (P) = 1,50 m, panjang lantai muka (lmk) = 14,00 m, panjang kolam olakan (lko) = 6,50 m dan lebar pintu pembilas (bpp) = 0,60 m. This study aims to plan the size of the dimensions, quantity and placement retention basin that will be planned in Oebobo District-Kupang City. The methods used are Gumbel Type I and Log Pearson Type III Methods and the Rational Method. From this study, it was obtained the planned rainfall with a 10-year return period (R10) using the Gumbel Type I Method of 159.142 mm and the amount of R10 using the Log Person Type III Method of 147.178 mm and the Chi-Square and Smirnov-Kolmogorov Match Test was accepted (Dmax QS = 6,070 m3/sec, then the total volume of water is 3,132,3536 m3 which is used to plan the type of retention basin lengthwise, with dimensions, namely: the width of the basin (Bbasin). ) = 4.00 m and depth (Dbasin) = 1.50 m, then the obtained length of the basin (Lbasin) = 522.00 m. The retention basin construction is equipped with a weir, where the weir height (P) = 1.50 m, the length of the front floor (lmk) = 14.00 m, the length of the stilling basin (lko) = 6.50 m and the width of the flushing door (bpp) = 0.60 m.