Abstract & Overview
Worldwide and particularly in developing countries there have been adverse effects on building projects as a result of constant variations in the course of implementing such projects. The objective of this study was to identify and analyse the major causes of variations in public building projects in Tanzania. This could help in monitoring the trends of variations and safeguarding the anticipated value for money in those building projects. Pertinent literature was reviewed coupled with structured questionnaires administered to architects, engineers, quantity surveyors and procurement officers to elicit individual’s perception with regard to factors of variations. The identified 25 factors of variations from literature were rated and ranked with regard to their importance and occurrence. Descriptive statistics, Cronbach’s alpha coefficient, factor analysis and t-test analysis were used to analyse data. Finding indicates the top four highly ranked factors of variations as change of plans or scope by clients, design discrepancies by consultants, misinterpretation of contract documents by the contractors and weather conditions. The agreement among respondents in rating and ranking the factors of variations was found to be considerable. Proper feasibility study of the project, sufficient time for design, inclusive design, and proper change control mechanism could help in reducing variations. Results from this study should help policy makers, construction practitioners, researchers and academicians to improve construction performance.