We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Site Implementation and Assessment of Lean Construction Techniques
PeriodicalsCivil & Construction Engineering

Site Implementation and Assessment of Lean Construction Techniques

Checking your access to this record.

Abstract & Overview

The goal of this paper is to test the effectiveness of some lean construction tools, in particular, those tools that can be applied in medium size construction firms. Due to the success of the lean production system in manufacturing, the construction industry has adapted lean techniques to eliminate waste and increase profit. A field study was conducted to evaluate the effectiveness of some lean construction techniques including last planner, increased visualization, daily huddle meetings, first run studies, the 5s process, and fail safe for quality. The data collection methods included direct observations, interviews, questionnaires, and documentary analysis. The effectiveness of the lean construction tools was evaluated through the lean implementation measurement standard and performance criteria. It was found that last planner, increased visualization, daily huddle meetings, and first run studies achieved more effective outcomes than expected. However, the results of implementation of 5s process and fail safe for quality did not meet the expectations of the tool champions and the research team. It was found that there is need for behavioral changes and training for effective use of lean tools. Most of the lean construction tools selected for the project are either ready to use, or are recommended with some modifications. A summary of the results is provided, and future research needs are outlined.

Cite this record

Ossama Salem, Julie Solomon, Ash Genaidy, Mark Luegering (2005). Site Implementation and Assessment of Lean Construction Techniques. Lean Construction Journal, 1–21. https://doi.org/10.60164/e2i9e2h1d

Copy in another style

Salem, O., Solomon, J., Genaidy, A., & Luegering, M. (2005). Site Implementation and Assessment of Lean Construction Techniques. Lean Construction Journal, 1–21. https://doi.org/10.60164/e2i9e2h1d
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.