We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/STUDI WAKTU PELAYANAN KAPAL DI DERMAGA I PELABUHAN BAKAUHENI
PeriodicalsCivil & Construction Engineering

STUDI WAKTU PELAYANAN KAPAL DI DERMAGA I PELABUHAN BAKAUHENI

Checking your access to this record.

Abstract & Overview

Bakauheni Port, located in Lampung Province, is the ferry ports serving ships from Sumatra Island heading to Java Island or vice versa. In general case, the problem of service performance often encounteres in port operations. Ineffective management of the port is one of the obstacles in service. The queue system of waiting ships during docking activity is one of the result of ineffective management of the ports operations. The purpose of this study was to calculate the time taken by ship in maneuvering, raise and drop off passengers at the Pier I of the Bakauheni Port. The research was conducted by surveys at dock I of the Bakauheni Port during the normal condition. Data were analysed so as to know the operational time required for loading and unloading ships and maneuver. Based on data analysis, it can be concluded that the headway value of each ship operating at Pier I is: Suki 59,50 minutes, BSP I 56,45 minutes, Mustika Kencana 50,13 minutes, HM Baruna 53,64 minutes, Jatra 2 45,91 minutes, 45,91 minutes and Shalem 44,97 minutes. The average headway of the ships at Pier I was 51,77 minutes. From the value, it shows the operating in Pier I Bakauheni Port has already reached optimum due to total time needed less than the time determined by Bakauheni Port with a total 24 ship trip in Pier I.

Cite this record

Galuh Pramita, Nurwanda Sari (2020). STUDI WAKTU PELAYANAN KAPAL DI DERMAGA I PELABUHAN BAKAUHENI. JICE (Journal of Infrastructural in Civil Engineering), 1(01), 14–14. https://doi.org/10.33365/jice.v1i01.702

Copy in another style

Pramita, G., & Sari, N. (2020). STUDI WAKTU PELAYANAN KAPAL DI DERMAGA I PELABUHAN BAKAUHENI. JICE (Journal of Infrastructural in Civil Engineering), 1(01), 14–14. https://doi.org/10.33365/jice.v1i01.702
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.