We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Chemical Engineering/Inspection Program Effectiveness Key Performance Indicator for Pressurized Static Equipment Integrity at Offshore Platform
PeriodicalsChemical Engineering

Inspection Program Effectiveness Key Performance Indicator for Pressurized Static Equipment Integrity at Offshore Platform

Checking your access to this record.

Abstract & Overview

One of the key challenges in asset integrity management system at offshore platform is the lack of visibility regarding performance issues and program effectiveness. Without proper performance measurement systems, it becomes difficult to address positive of negative trends promptly and for management to stay informed about the status and the impact of the inspection program. Therefore, Key Performance Indicator (KPI) is needed to measure its effectiveness to prevent undesirable equipment failures that could lead to Loss of Primary Containment (LOPC) or Process Safety Event (PSE). The developed KPI is the ratio of the number of non-leak inspection findings with a remaining life of less than 3 years to the total number of all anomalies with a remaining life of less than 3 years, including leak findings. By applying this KPI, inspection program effectiveness for an offshore field could be monitored and improved steadily from 29% in 2018 to 82% in 2023, with some fluctuations in performance before achieving a strong recovery in later years.

Cite this record

Teuku Ahmad Haekal, Johny Wahyuadi Soedarsono, Badrul Munir, Yudi Masduki (2024). Inspection Program Effectiveness Key Performance Indicator for Pressurized Static Equipment Integrity at Offshore Platform. Journal of Materials Exploration and Findings, 3(3), 211–219. https://doi.org/10.7454/jmef.v3i3.1073

Copy in another style

Haekal, T. A., Soedarsono, J. W., Munir, B., & Masduki, Y. (2024). Inspection Program Effectiveness Key Performance Indicator for Pressurized Static Equipment Integrity at Offshore Platform. Journal of Materials Exploration and Findings, 3(3), 211–219. https://doi.org/10.7454/jmef.v3i3.1073
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.