Abstract & Overview
This work presents the variant technical solutions for transport of waste to the external landfill of the open pit Gacko. The construction of road has several purposes and should ensure the stabilization of the outer landfill in the zone with deposited quaternary sediments as well as the waste transport to the external landfill by the high-capacity trucks. The selection of a more favorable variant was made from the aspect of unit costs for the waste transport and from the aspect of the costs of variant solutions.