Abstract & Overview
In Korea, disputes and lawsuits over the defect of apartment building are constantly becoming a social problem.In lawsuits over the defect the apartment building, the term of warranty liability, as the period that can demand the defect repair according to defect occurrence, is important because it is the exclusion period of the exercise of rights.However, at the time of enactment of the relevant law and regulation, it was described without sufficient basis, and subsequent amendments were made arbitrarily without clear basis.Therefore, it is necessary to formulate a basis system promptly through sufficient research and review related to the term of warranty liability.This study conducted basic research for a reasonable establishment of term of warranty liability for the subject of the finish work defect out of various defects occurring in the apartment building.We investigated the number of defect occurrence in 177 apartment complexes and reviewed the trends of defects by detailed construction type and by year.As a result, the total number of occurrences of defects was 1,449,745, and the number one of defect occurrence was finishing work by 42.54%.In addition, if detailed construction types of the finishing work are listed the in order from the largest number of occurrences of defects, it showed in order of indoor furniture work, tile work, wallpaper work, interior work, painting work, plastering work, insulation work.On the other hand, as a result of reviewing defect occurrence and accumulated trends every year from 1 to 10 years on the number of defect occurrence of finishing work by term of warranty liability, it was found that 6 construction types of finishing works except for insulation work had defects of more than 50% after the first year of completion.Also, in the third year of completion, the accumulated trends of defect occurrence exceeded 90% in all of 6 detailed construction types of works except for painting work.The overall tendency of defect occurrence trends showed that defect occurrence in 6 detailed construction type except for insulation work was concentrated in the 1st to 2nd year, that is, the number of defect occurrence of the 1st year was very large, started to decrease rapidly from the 2nd year, and was very small from the 3rd year.