Causes of Variation Orders in Road Construction Projects in Sri Lanka

Checking your access to this record.

Abstract & Overview

One of the most important problems in the construction industry is variations. They occur in every construction project and the magnitude of these variations varies considerably from project to project. Hence, the variations orders bear great importance right from the inception to completion in the construction industry. Most of the road construction projects in Sri Lanka have experienced a large number of variation orders. The client had to spend more than what was initially estimated in most cases. Sometimes, disputes and unnecessary delays occur due to variations. This study attempted to reveal the possible causes of variation orders in the road construction projects in Sri Lanka. The data were collected through a literature review, a case study analysis focused on 11 road construction projects, and a questionnaire administered to professionals in the road construction industry in Sri Lanka. The study found out that the causes in the local context differ from those in the international context. According to the questionnaire survey, poor estimation was the most significant cause of variation orders. Unforeseen site conditions, political pressure during construction stage, poor investigation, and client-initiated variations occupy the 2nd to 5th places, respectively, in the ranking. This ranking was further proven through the case study analysis.

Cite this record

Rangika Umesh Halwatura, N. P. N. P. Ranasinghe (2013). Causes of Variation Orders in Road Construction Projects in Sri Lanka. ISRN Construction Engineering, 2013, 1–7. https://doi.org/10.1155/2013/381670

Copy in another style

Halwatura, R. U., & Ranasinghe, N. P. N. P. (2013). Causes of Variation Orders in Road Construction Projects in Sri Lanka. ISRN Construction Engineering, 2013, 1–7. https://doi.org/10.1155/2013/381670
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.