We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Electrical Engineering/Early Loading of Cast-in-Situ Reinforced Concrete Structures
PeriodicalsElectrical Engineering

Early Loading of Cast-in-Situ Reinforced Concrete Structures

Checking your access to this record.

Abstract & Overview

The article provides an overview of the existing methods of early loading of monolithic structures. It is shown that keeping concrete up to standard strength without taking into account the stages of loading leads to a significant increase in the cost of work, especially in winter. Based on experimental studies, formulas are proposed for calculating the required strength by the moment of loading of monolithic foundations, walls, columns, ceilings. Instructions are given on the design of early loading technology. The results of full-scale tests of floors under conditions of early loading are given. The technology of tiered heat treatment of monolithic structures is described.

Cite this record

A Baiburin (2023). Early Loading of Cast-in-Situ Reinforced Concrete Structures. Reinforced concrete structures, 2(2), 13–21. https://doi.org/10.22227/2949-1622.2023.2.13-21

Copy in another style

Baiburin, A. (2023). Early Loading of Cast-in-Situ Reinforced Concrete Structures. Reinforced concrete structures, 2(2), 13–21. https://doi.org/10.22227/2949-1622.2023.2.13-21
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.