We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Mathematics/ارائه و بهینهسازی مدل چندهدفه زمانبندی جریان کارگاهی به منظور کاهش مصرف انرژی، زمان اتمام و زمان دیرکرد
PeriodicalsMathematics

ارائه و بهینهسازی مدل چندهدفه زمانبندی جریان کارگاهی به منظور کاهش مصرف انرژی، زمان اتمام و زمان دیرکرد

Checking your access to this record.

Abstract & Overview

Energy consumption considerations in production systems have recently attracted the attention of researchers. In conventional production scheduling models, the importance has more often been given to time-related rather than to energy-related performance measures. In this paper, we simultaneously consider energy consumption, completion time and tardiness in the presented Multi-Objective Mixed Integer Programming flow shop scheduling model. After validating the model by solving small-scale numerical examples with Weighted Sum and Epsilon-constraint method in GAMS, the large and medium-scale examples are solved via NSGA-II and SPEA-II metaheuristic-algorithms. The results prove the efficiency of the proposed algorithms.

Cite this record

Author (2018). ارائه و بهینهسازی مدل چندهدفه زمانبندی جریان کارگاهی به منظور کاهش مصرف انرژی، زمان اتمام و زمان دیرکرد. تصمیم گیری و تحقیق در عملیات, 3(3), 204–222. https://doi.org/10.22105/dmor.2018.81214

Copy in another style

Author. (2018). ارائه و بهینهسازی مدل چندهدفه زمانبندی جریان کارگاهی به منظور کاهش مصرف انرژی، زمان اتمام و زمان دیرکرد. تصمیم گیری و تحقیق در عملیات, 3(3), 204–222. https://doi.org/10.22105/dmor.2018.81214
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.