Systematic Risk Management Approach for Construction Projects

Checking your access to this record.

Abstract & Overview

Risk is inherently present in all construction projects. Quite often, construction projects fail to achieve their time, quality, and budget goals. A risk model entitled construction risk management system (CRMS) is introduced to help contractors identify project risks and systematically to analyze and manage them. The CRMS model is a logical substitute for the traditional intuitive unsystematic approach currently used by most contractors. The influence diagramming technique and Monte Carlo simulation are used as tools to analyze and evaluate project risks. Alternative risk management strategies are suggested. Such strategies include: risk avoidance, risk transfer, risk retention, loss reduction, and risk prevention and insurance.

Cite this record

Jamal F. Al‐Bahar, Keith C. Crandall (1990). Systematic Risk Management Approach for Construction Projects. Journal of Construction Engineering and Management, 116(3), 533–546. https://doi.org/10.1061/(asce)0733-9364(1990)116:3(533)

Copy in another style

Al‐Bahar, J. F., & Crandall, K. C. (1990). Systematic Risk Management Approach for Construction Projects. Journal of Construction Engineering and Management, 116(3), 533–546. https://doi.org/10.1061/(asce)0733-9364(1990)116:3(533)
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.