We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Investigating and analyzing the most important delay causes in Kurdistan Building Construction Projects
PeriodicalsCivil & Construction Engineering

Investigating and analyzing the most important delay causes in Kurdistan Building Construction Projects

Checking your access to this record.

Abstract & Overview

The most controversial trouble that happened in the construction projects is Delay. So, the specified research took part to investigate the basic causes in delaying the Kurdistan Region of Iraq. The study gathered information from the insight of contractors, consultants, and owners. A wide literature review has been discussed. The delay causes are recognized built on the identified literature review. These features are characterized into owner-related, consultant-related, contractor-related, material-related, labour and equipment-related, and external-related groups. Twenty- six experienced persons participated in doing the questionnaire surveys to control the relative importance of every cause. The work discovered that the highest five reasons for postponement in building projects are financial difficulties by contractors, variation in prices, postponement in making and appreciative shop diagrams, lack of labour, and mistakes in soil study. Lastly, the probable approaches of dropping plan postponements are suggested. This work helps as a helpful tool for construction experts and academics to prevent reasons for postponement in constructing schemes in Kurdistan.

Cite this record

Sevar Neamat (2021). Investigating and analyzing the most important delay causes in Kurdistan Building Construction Projects. Journal of Civil Engineering Frontiers, 2(01), 08–12. https://doi.org/10.38094/jocef20132

Copy in another style

Neamat, S. (2021). Investigating and analyzing the most important delay causes in Kurdistan Building Construction Projects. Journal of Civil Engineering Frontiers, 2(01), 08–12. https://doi.org/10.38094/jocef20132
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.