Abstract & Overview
According to the current situation that there exists a low drilling speed in the hard-digging formation of the high-temperature and high-pressure well section deep in the superdeep well,a kind of TRO-127 refractory and long-life double-stage epicyclic gear deceleration turbodrill with a storage compensation system and metal butt-end packing structure was designed and successfully developed. The field test results,which have been obtained from the superdeep well section in Tashen Well No. 1 and Well TH12509,show that,compared with the average penetration rate of the rotary drilling in the neighboring formation of the lower part of the same well,the average speed of the composite drilling adopting the TRO 127 deceleration turbodrill increases by over 92%,and compared with the average penetration rate of the rotary drilling of the neighboring well in the same formation,it increases by over 123%. It is suggested that the composite drilling technology of the deceleration turbodrill be spread and applied in the slim-hole well section of China's western superdeep wells so as to quicken the exploration and development of deep oil-gas reservoirs.