We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Preliminary Construction Cost Estimate in Yemen by Artificial Neural Network
PeriodicalsCivil & Construction Engineering

Preliminary Construction Cost Estimate in Yemen by Artificial Neural Network

Checking your access to this record.

Abstract & Overview

The construction industry in Yemen is currently facing challenges associated with rapid development of technology; thus, cost estimation is considered a key factor that should align with this technological advancement. The main problem in the area of preliminary estimate in Yemen is how to make estimate accurately. The aim of this study is to analyse a modern method of preliminary cost estimation in Yemen to prove its efficiency over the traditional method. Therefore, a wide range of literature sources regarding the preliminary estimates using Artificial Neural Network (ANN) as a modern technique is considered. Both qualitative and quantitative approaches were adopted in this study depending on the theoretical premises discussed in literature and the ANN technique, respectively. The independent variables were chosen in the course of literature review. The collected data were classified and processed regarding the ANN constraints and encoded for building and analysis of the ANN model. NeuroSolution 6 software was used to build, train, and test the network as well as to perform sensitivity analysis. In addition, the results of training, testing, and sensitivity analysis were obtained and discussed showing high effectiveness of accurate estimates with less than 1 % error. The ANN model is a more powerful technique for estimating costs in the preliminary stage that should be used in the developing countries instead of the traditional methods.

Cite this record

Waled Hakami, Awad Hassan (2019). Preliminary Construction Cost Estimate in Yemen by Artificial Neural Network. Baltic Journal of Real Estate Economics and Construction Management, 7(1), 110–122. https://doi.org/10.2478/bjreecm-2019-0007

Copy in another style

Hakami, W., & Hassan, A. (2019). Preliminary Construction Cost Estimate in Yemen by Artificial Neural Network. Baltic Journal of Real Estate Economics and Construction Management, 7(1), 110–122. https://doi.org/10.2478/bjreecm-2019-0007
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.