We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Computing Hydrological Balance in the Medard Mining Pit With the Help of the Water Balance Conceptual Model (WBCM)
PeriodicalsCivil & Construction Engineering

Computing Hydrological Balance in the Medard Mining Pit With the Help of the Water Balance Conceptual Model (WBCM)

Checking your access to this record.

Abstract & Overview

A positive water balance is the main prerequisite for successful hydro-reclamation of residual mining pits. Under the current conditions of climate change, long dry periods occur more frequently, which may have a negative impact on the water supply to fill the pit lakes. This study deals with the hydrological balance of the Medard mining pit, which has been computed with the help of the Water Balance Conceptual Model (WBCM). The purpose of this study is to test the feasibility of the WBCM model for water balance estimation in endorheic catchments. The water contribution of the Medard mining pit’s own catchment was quantified, in order to determine if an external supply of water is necessary to fill the pit within several years. The outcomes of the study have shown that the internal water sources of the Medard catchment can hardly provide sufficient water supply, either during a normal, or during a dry hydrological year. Thus, an external water supply from the Ohre River is needed in addition to the water from the mining pits (the quality of the water from the mining pits must of course be carefully monitored). The WBCM-6 model can serve as a useful tool in hydro-reclamation of residual mining pits. However, the final performance regulations of pit lakes must be based on water management balance, including human-induced activities.

Cite this record

Pavel Kovář, Jana Kalibová, Hana Bačinová (2016). Computing Hydrological Balance in the Medard Mining Pit With the Help of the Water Balance Conceptual Model (WBCM). Journal of Civil & Environmental Engineering, 06(05). https://doi.org/10.4172/2165-784x.1000250

Copy in another style

Kovář, P., Kalibová, J., & Bačinová, H. (2016). Computing Hydrological Balance in the Medard Mining Pit With the Help of the Water Balance Conceptual Model (WBCM). Journal of Civil & Environmental Engineering, 06(05). https://doi.org/10.4172/2165-784x.1000250
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.