We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Beishan underground research laboratory for geological disposal of high-level radioactive waste: design, excavation, characterization, and in situ tests during construction
PeriodicalsCivil & Construction Engineering

Beishan underground research laboratory for geological disposal of high-level radioactive waste: design, excavation, characterization, and in situ tests during construction

Checking your access to this record.

Abstract & Overview

The Beishan underground research laboratory (URL) will be China’s first underground facility dedicated to developing a deep geological repository (DGR) for high-level radioactive waste (HLW). This facility was approved in 2019 and construction, which began in 2021, is expected to complete by 2028. It consists of a spiral ramp, three shafts, and two experimental levels at depths of -280 m and -560 m. The spiral ramp, the world’s first hard-rock spiral tunnel excavated using a specially designed tunnel boring machine (TBM), demonstrates the successful application of TBM technology while causing minimal disturbance to the surrounding rocks. Comprehensive site characterization carried out when excavating the URL, including geological mapping, hydrogeological monitoring, rock mechanical testing, in situ stress measurements, and rock mass classification, confirmed predictions made in pre-excavation investigations. The results indicate that the rock mass at the URL site is highly intact, with sparsely distributed fractures, and is further characterized by a low water-bearing capacity, weak hydraulic connectivity, and slow deep groundwater circulation. In addition, the rock mass exhibits high strength, relatively low in situ stresses, and predominantly high quality, mainly corresponding to Classes I and II according to the adopted rock mass classification system. These characteristics are favorable for constructing a DGR. A systematic in situ testing program involving 24 tests is being implemented in parallel to support site characterization and verify engineering technologies. Representative tests such as TBM excavation disturbance monitoring and verification of the deposition hole boring machine—a specially designed drilling system used to excavate vertical deposition holes for HLW canisters—have already been successfully conducted, showing limited excavation-induced disturbances in the surrounding rock mass and confirming the feasibility and accuracy of deposition hole drilling under in situ conditions. These integrated efforts provide essential scientific data, validate key technologies, and establish a solid foundation for the DGR program in China, while also contributing to international knowledge on the geological disposal of HLW.

Cite this record

Ju Wang, L. Chen, Zhichao Zhou, Xingguang Zhao, Hongsu Ma, Xiao Tian, et al. (2026). Beishan underground research laboratory for geological disposal of high-level radioactive waste: design, excavation, characterization, and in situ tests during construction. Environmental Geological and Geotechnical Engineering, 1(1), 100002–100002. https://doi.org/10.1016/j.egge.2026.100002

Copy in another style

Wang, J., Chen, L., Zhou, Z., Zhao, X., Ma, H., Tian, X., Liu, J., & Zhang, Q. (2026). Beishan underground research laboratory for geological disposal of high-level radioactive waste: design, excavation, characterization, and in situ tests during construction. Environmental Geological and Geotechnical Engineering, 1(1), 100002–100002. https://doi.org/10.1016/j.egge.2026.100002
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.