We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/A Management Maturity Model (MMM) for project-based organisational performance assessment
PeriodicalsCivil & Construction Engineering

A Management Maturity Model (MMM) for project-based organisational performance assessment

Checking your access to this record.

Abstract & Overview

Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM) to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide) published by the Project Management Institute (PMI), but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.

Cite this record

Craig Langston, Amir Naser Ghanbaripour (2016). A Management Maturity Model (MMM) for project-based organisational performance assessment. Construction Economics and Building, 16(4), 68–85. https://doi.org/10.5130/ajceb.v16i4.5028

Copy in another style

Langston, C., & Ghanbaripour, A. N. (2016). A Management Maturity Model (MMM) for project-based organisational performance assessment. Construction Economics and Building, 16(4), 68–85. https://doi.org/10.5130/ajceb.v16i4.5028
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.