We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Software Engineering/Dynamic Scheduling for Large-Scale Flexible Job Shop Based on Noisy DDQN
PeriodicalsSoftware Engineering

Dynamic Scheduling for Large-Scale Flexible Job Shop Based on Noisy DDQN

Checking your access to this record.

Abstract & Overview

The large-scale flexible job shop dynamic scheduling problem (LSFJSDSP) has a more complex solution space than the original job shop problem because of the increase in the number of jobs and machines, which makes the traditional solution algorithm unable to meet the actual production requirements in terms of the solution quality and time. To address this problem, we develop a dynamic scheduling model of a large-scale flexible job shop based on noisynet-double deep Q-networks (N-DDQNs), which takes the minimum expected completion time as the optimization objective and thoroughly takes into account the two dynamic factors (the new job arrival and the stochastic processing time). Firstly, a Markov decision process model is constructed for dynamic scheduling of a large-scale flexible workshop, and the corresponding reasonable state space, action space and reward function are designed. To address the problems (of solution stability and unsatisfactory scheduling strategy selection) in the conventional exploration method of DDQNs, learnable noise parameters are added to the DDQNs to create the N-DDQN algorithm framework, where the uncertainty weight is added. Secondly, the learnable noise parameters are added to the DDQNs to form the N-DDQN algorithm framework, and the uncertainty weight is added to realize automatic exploration. Hence, the issue is solved that the traditional DDQN exploration method may result in unsatisfactory solution stability and scheduling strategy selection. The proposed method, which has significant flexibility and efficacy, is demonstrated (by experimental findings) to be superior to the conventional method based on compound scheduling rules in tackling large-scale flexible job shop dynamic scheduling problems.

Cite this record

Tingjuan Zheng, Yongbing Zhou, Mingzhu Hu, Jian Zhang (2023). Dynamic Scheduling for Large-Scale Flexible Job Shop Based on Noisy DDQN. International Journal of Network Dynamics and Intelligence, 2(4). https://doi.org/10.53941/ijndi.2023.100015

Copy in another style

Zheng, T., Zhou, Y., Hu, M., & Zhang, J. (2023). Dynamic Scheduling for Large-Scale Flexible Job Shop Based on Noisy DDQN. International Journal of Network Dynamics and Intelligence, 2(4). https://doi.org/10.53941/ijndi.2023.100015
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.