We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Mathematics/Bayesian inference in control charts using normal prior
PeriodicalsMathematics

Bayesian inference in control charts using normal prior

Checking your access to this record.

Abstract & Overview

The Control Chart is a method of quality control which utilizes statistical methods to monitor and manage processes and based on the sampling inspections and chart performance. This issue is currently being researched into the economic planning of control chart. The traditional approach to design control chart utilizes the traditional structure of control plot to determine the value of parameters of the chart, namely: The sample size, sample interval and control chart limits for achieving economic needs. Under Bayes estimate framework, focus on defining the optimal control policy based on posterior probabilities, thereby reducing total expected costs in the given finite time horizon or the expected average long-term costs.

Cite this record

S. Abirami, N Vijayasankar, S. Sasikala (2023). Bayesian inference in control charts using normal prior. International Journal of Statistics and Applied Mathematics, 8(1), 22–25. https://doi.org/10.22271/maths.2023.v8.i1a.922

Copy in another style

Abirami, S., Vijayasankar, N., & Sasikala, S. (2023). Bayesian inference in control charts using normal prior. International Journal of Statistics and Applied Mathematics, 8(1), 22–25. https://doi.org/10.22271/maths.2023.v8.i1a.922
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.