We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Mathematics/A stochastic programming approach for sawmill production planning
PeriodicalsMathematics

A stochastic programming approach for sawmill production planning

Checking your access to this record.

Abstract & Overview

This paper investigates a sawmill production planning problem where the non-homogeneous characteristics of logs result in random process yields. A two-stage stochastic Linear Programming (LP) approach is proposed to address this problem. The random yields are modelled as scenarios with discrete probability distributions. The solution methodology is based on the sample average approximation method. Confidence intervals are constructed for the optimality gap of several candidate solutions, based on Common Random Number (CRN) streams. A computational study including a prototype sawmill is presented to highlight the significance of using the stochastic model instead of the mean-value deterministic model, which is the traditional production planning tool in sawmills.

Cite this record

Masoumeh Kazemi Zanjani, Daoud Aït-Kadi, Mustapha Nourelfath (2012). A stochastic programming approach for sawmill production planning. International Journal of Mathematics in Operational Research, 5(1), 1–1. https://doi.org/10.1504/ijmor.2013.050604

Copy in another style

Zanjani, M. K., Aït-Kadi, D., & Nourelfath, M. (2012). A stochastic programming approach for sawmill production planning. International Journal of Mathematics in Operational Research, 5(1), 1–1. https://doi.org/10.1504/ijmor.2013.050604
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.