An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations

Checking your access to this record.

Abstract & Overview

Heavy earthmoving operations are repetitive in nature and vulnerable to time-related restraints and uncertainties. Therefore, at the conceptual stage, scheduling these operations can take a linear form, known as linear schedule or line of balance (LOB). In such type of work, generating a preliminary line of balance for variable sequencing of activities is crucial. In this paper, an integrated expert system for determining preliminary linear schedules for heavy earthmoving operations at the conceptual stage is presented. The proposed system incorporates numerous factors that influence the analysis of earthmoving operations, which include geological and topographical parameters used to determine productivity rates at the conceptual stage. Also, the proposed system is capable of automatically generating a line of balance based on a stochastic scheduling technique via the metaheuristic simulated annealing intelligent approach to incorporate randomness and uncertainties in performing the associated activities. A parametric analysis is conducted in order to quantify the system’s degree of accuracy. An actual case project is then utilized to illustrate its numerical capabilities. Generating accurate linear schedules for heavy earthmoving operations at the conceptual design stage is anticipated to be of major significance to infrastructure project stakeholders, engineers, and construction managers by detecting schedule’s conflicts early in order to enhance overall operational logistics.

Cite this record

Nizar Markiz, Ahmad Jrade (2016). An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations. Journal of Construction Engineering, 2016, 1–16. https://doi.org/10.1155/2016/2312057

Copy in another style

Markiz, N., & Jrade, A. (2016). An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations. Journal of Construction Engineering, 2016, 1–16. https://doi.org/10.1155/2016/2312057
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.