Home/e-Resources/Civil & Construction Engineering/Project Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims
PeriodicalsCivil & Construction Engineering

Project Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims

Checking your access to this record.

Abstract & Overview

Delays in construction projects are generally understood to be the sole responsibility of the contractor. In fact, these delays can also be caused by factors that actually are the responsibility of the owner, resulting in project completion exceeding the contract target date. As a result, the contractors can be affected and suffer losses due to delays that are not actually their responsibility. This study intends to evaluate project delays caused by the owner and the delay claims submitted by the contractor. This research is exploratory and uses a mixed method of quantitative and qualitative approach. Data was collected through interviews and questionnaires with 80 respondents of the construction industry. The study found five main factors causing delays caused by the owner, including: land acquisition problems, changes in design and work instructions, payment problems, and unclear drawings in the contract documents. Of these delays, the majority (93%) were claimed by contractors, with an average claim success rate of 53%, and the compensation generally in the form of extension of project completion time (63%). The most frequently chosen claim dispute settlement method (93%) is non-litigation settlement through negotiation. This research has provided a comprehensive overview of delays due to owners and the contractor claims, and gives valuable lessons for the construction industry stakeholders to cope with delays in the future.

Cite this record

Jati Utomo Dwi Hatmoko, Raden Arya Pratistha, Arif Nur Hidayat (2023). Project Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims. MEDIA KOMUNIKASI TEKNIK SIPIL, 28(2), 212–218. https://doi.org/10.14710/mkts.v28i2.45875

Copy in another style

Hatmoko, J. U. D., Pratistha, R. A., & Hidayat, A. N. (2023). Project Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims. MEDIA KOMUNIKASI TEKNIK SIPIL, 28(2), 212–218. https://doi.org/10.14710/mkts.v28i2.45875
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.