We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Computer Science & Information Technology/The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan
PeriodicalsComputer Science & Information Technology

The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan

Checking your access to this record.

Abstract & Overview

The integrated production and transportation scheduling problem (PTSP) with capacity constraints is common in many industries. An optimal solution to PTSP requires one to simultaneously solve the production scheduling and the transportation routing problems, which requires excessive computational time, even for relatively small problems. In this study, we consider a variation of PTSP that involves a short shelf life product; hence, there is no inventory of the product in process. Once a lot of the product is produced, it must be transported with nonnegligible transportation time directly to various customer sites within its limited lifespan. The objective is to determine the minimum time required to complete producing and delivering the product to meet the demand of a given set of customers over a wide geographic region. This problem is NP-hard in the strong sense. We analyze the properties of this problem, develop lower bounds on the optimal solution, and propose a two-phase heuristic based on the analysis. The first phase uses either a genetic or a memetic algorithm to select a locally optimal permutation of the given set of customers; the second phase partitions the customer sequence and then uses the Gilmore-Gomory algorithm to order the subsequences of customers to form the integrated schedule. Empirical observations on the performance of this heuristic are reported.

Cite this record

H. Neil Geismar, Gilbert Laporte, Lei Lei, Chelliah Sriskandarajah (2007). The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan. INFORMS journal on computing, 20(1), 21–33. https://doi.org/10.1287/ijoc.1060.0208

Copy in another style

Geismar, H. N., Laporte, G., Lei, L., & Sriskandarajah, C. (2007). The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan. INFORMS journal on computing, 20(1), 21–33. https://doi.org/10.1287/ijoc.1060.0208
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.