We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/OPTIMIZATION OF THE RECEIVING BUNKER OPERATION DURING THE BLOCKING OF BULK MATERIALS
PeriodicalsCivil & Construction Engineering

OPTIMIZATION OF THE RECEIVING BUNKER OPERATION DURING THE BLOCKING OF BULK MATERIALS

Checking your access to this record.

Abstract & Overview

The article discusses an urgent problem that significantly affects the efficiency of concrete mixing enterpris-es - the formation of vaults in receiving bunkers. This phenomenon leads to unpredictable shutdowns of the production process, reduced equipment productivity and increased maintenance costs. The analysis of mod-ern methods of dealing with the vault showed their limited effectiveness. Vibration and pneumatic systems, which are widely used today, are not always able to completely eliminate the problem, especially when changing the properties of bulk materials or the geometric parameters of hoppers. In order to increase the reliability and performance of concrete mixing plants, a new approach has been proposed, which involves the use of a special ripper. This device is equipped with mechanical elements that allow you to effectively de-stroy the vault in the area of the hopper outlet, ensuring a continuous flow of material. The introduction of a special ripper at concrete mixing plants will improve the quality of finished products, reduce the cost of pro-duction and ensure the stable operation of the enterprise. The results obtained can be used to optimize the design of receiving bins and develop new technologies for processing bulk materials.

Cite this record

Author (2025). OPTIMIZATION OF THE RECEIVING BUNKER OPERATION DURING THE BLOCKING OF BULK MATERIALS. Construction Engineering, (41), 47–55. https://doi.org/10.32347/tb.2024-41.0405

Copy in another style

Author. (2025). OPTIMIZATION OF THE RECEIVING BUNKER OPERATION DURING THE BLOCKING OF BULK MATERIALS. Construction Engineering, 47–55. https://doi.org/10.32347/tb.2024-41.0405
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.