We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/SUMMERIZING STRUCTURE AND FUNCTION OF FORMWORK IN MULTI STORIED RCC BUILDING
PeriodicalsCivil & Construction Engineering

SUMMERIZING STRUCTURE AND FUNCTION OF FORMWORK IN MULTI STORIED RCC BUILDING

Checking your access to this record.

Abstract & Overview

The formwork system of floor slab is an important element in construction of multi-storied RCC buildings which governs the duration and cost of construction. The formwork and shoring structure does not extend to the foundation after the first few slab levels. Generally the formwork and back propping of one or two levels is provided. The research articles give insight on various technical parameters (slab shore load distribution, age of concrete, spacing of shores etc) that affect the design of formwork system. The case studies of failure during construction throw light on causes of failure. The use of proper formwork system will speed up the construction process of overall building with lesser cost.

Cite this record

ANIRUDDHA DESHMUKH, Girish Joshi, Shyambhau Bun, Ajay G. Dahake (2022). SUMMERIZING STRUCTURE AND FUNCTION OF FORMWORK IN MULTI STORIED RCC BUILDING. INTERNATIONAL JOURNAL OF CONSTRUCTION ENGINEERING AND PLANNING. https://doi.org/10.37628/ijce.v8i1.748

Copy in another style

DESHMUKH, A., Joshi, G., Bun, S., & Dahake, A. G. (2022). SUMMERIZING STRUCTURE AND FUNCTION OF FORMWORK IN MULTI STORIED RCC BUILDING. INTERNATIONAL JOURNAL OF CONSTRUCTION ENGINEERING AND PLANNING. https://doi.org/10.37628/ijce.v8i1.748
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.