We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Research and Application of Grouting Stopper
PeriodicalsCivil & Construction Engineering

Research and Application of Grouting Stopper

Checking your access to this record.

Abstract & Overview

The anchor cable grouting stopper used in the foundation pit (slope) support project of the core business street in Wuxiang New District, Nanning, has the characteristics of large grouting hole diameter and high grouting pressure, which makes it difficult to connect the stopper with the anchor cable body. The existing anchor cable grouting stopper structure is difficult to meet the requirements of this project. In order to ensure the smooth implementation of the project, a grouting stopper was designed according to the characteristics of this project. Its performance was verified through experiments, which can solve the technical problems of this project and can be widely used in engineering.

Cite this record

Ruijian Pang, Huan Lei, Jin Xie (2017). Research and Application of Grouting Stopper. Prestress Technology, 21(02), 27–31. https://doi.org/10.59238/j.pt.2017.02.007

Copy in another style

Pang, R., Lei, H., & Xie, J. (2017). Research and Application of Grouting Stopper. Prestress Technology, 21(02), 27–31. https://doi.org/10.59238/j.pt.2017.02.007
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.