We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Mitigation of Building Failures in Uganda’s Construction Industry: A Case Study of Greater Bushenyi District
PeriodicalsCivil & Construction Engineering

Mitigation of Building Failures in Uganda’s Construction Industry: A Case Study of Greater Bushenyi District

Checking your access to this record.

Abstract & Overview

Building failures result into economic and temporal deviations in construction industry. Despite the efforts to improve the quality of construction works through use of advanced technology, increased labor force for professionals in the construction industry, increased availability of construction equipment, there is still low quality work. The purpose of the study was to develop strategies to mitigate building failures in the construction industry in Uganda. The study adopted a descriptive survey research design which was carried out in the districts of Greater Bushenyi district in Western Uganda. The study population comprised of 210 respondents: Supervising engineers, Site engineers, Site foremen, Clerk of works and Clients. Causes of building failures were categorized as: consultant related; contractor related, client related and external related factors. The data collected were analyzed quantitatively using SPSS Ver.20 and Microsoft excel. Data were further analyzed using correlation and regression analysis. Findings were presented using frequencies, tables, pie charts and graphs. The findings indicated that Inadequate supervision of works (RII= 0.77); Shortage of equipment and materials (RII=0.76); Cash flow problems (RII=0.67) and Inflation in prices (RII=0.70) were the leading causes of building failure in their respective categories. Based on study findings, it was concluded that there is a great influence of consultant related factors on the causes of building failures more particularly related with inadequate supervision of projects. Factors relating to defects in structures can potentially be avoided if qualified construction professionals are appointed to exercise due diligence and if professional teams are given the opportunity to guide contractors during contract execution.

Cite this record

Lawrence Muhwezi, Dicklus Twinamatsiko, Joseph Acai (2020). Mitigation of Building Failures in Uganda’s Construction Industry: A Case Study of Greater Bushenyi District. International Journal of Construction Engineering and Management, 9(1), 11–19. https://library.shubhaarti.com/content/f67113a9-79c9-4978-a274-70e9cc9049da

Copy in another style

Muhwezi, L., Twinamatsiko, D., & Acai, J. (2020). Mitigation of Building Failures in Uganda’s Construction Industry: A Case Study of Greater Bushenyi District. International Journal of Construction Engineering and Management, 9(1), 11–19. https://library.shubhaarti.com/content/f67113a9-79c9-4978-a274-70e9cc9049da
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.