We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Mechanical Engineering/Reduction of Machine Setup Time

Checking your access to this record.

Abstract & Overview

Customers today require smaller series of products. In manufacturing companies, this increases machine setup time, which is a waste. This paper presents a procedure for organizing and implementing a reduction of machine setup time. It is based on teamwork and uses the SMED method, which allows a gradual reduction of machine setup time to less than 10 minutes, and a continuous improvement system. The paper also presents the results of the organization and execution of a SMED workshop for the reduction of setup times in a jet machine, as well as first suggestions for improvements that should significantly reduce machine setup time.

Cite this record

Janez Kušar, Tomaž Berlec, Ferdinand Žefran, Marko Starbek (2010). Reduction of Machine Setup Time. Strojniški vestnik – Journal of Mechanical Engineering, 56(12), 833–845. https://doi.org/10.5545/162_doi_not_assigned

Copy in another style

Kušar, J., Berlec, T., Žefran, F., & Starbek, M. (2010). Reduction of Machine Setup Time. Strojniški vestnik – Journal of Mechanical Engineering, 56(12), 833–845. https://doi.org/10.5545/162_doi_not_assigned
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.