We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Nanotechnology/Major contributing factors to the lower level of connection to the existing sewer network in Addis Ababa: the case of the Kality catchment
PeriodicalsNanotechnology

Major contributing factors to the lower level of connection to the existing sewer network in Addis Ababa: the case of the Kality catchment

Checking your access to this record.

Abstract & Overview

Many households in Addis Ababa have not been connected to a sewer network, even when it passes by their homes. This study was designed to investigate major factors that have contributed to the lower level of connection to the existing sewer network in the Kality catchment of Addis Ababa. A household survey was conducted via questionnaire to identify the reasons hindering customers from connecting to sewers. The main factors identified were lack of awareness, connection fee, topography, customers’ preference for onsite sanitation over sewers, customers’ unwillingness to reinstate fences or pavements in their compound, and the unreliability of the water utility service. The survey results were analyzed with a binary logistic regression model using SPSS software. Except for topography (p-value 0.792) and connection fee (p-value 0.446), the other four independent variables had significant p values of less than 0.05, which implied a good model. Customers’ preference for onsite sanitations over sewers, followed by the unreliability of the water utility service and customers’ unwillingness to reinstate fences or pavements in their compounds were found to be the factors that most contribute to the lower level of user interest in sewer connection. However, a lack of awareness and information was also crucial in determining the rate of connection to sewers in the Kality catchment of Addis Ababa. The study also revealed that there was a gap in legislation and its enforcement: there was neither a regulator nor regulations for monitoring wastewater management, including mandatory sewer connection in the city.

Cite this record

Mohammed Ali, Sirak Robele (2023). Major contributing factors to the lower level of connection to the existing sewer network in Addis Ababa: the case of the Kality catchment. Frontiers in Environmental Engineering, 2. https://doi.org/10.3389/fenve.2023.1158656

Copy in another style

Ali, M., & Robele, S. (2023). Major contributing factors to the lower level of connection to the existing sewer network in Addis Ababa: the case of the Kality catchment. Frontiers in Environmental Engineering, 2. https://doi.org/10.3389/fenve.2023.1158656
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.