We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Implementasi Building Information Modelling (BIM) 5D Pada Estimasi Volume dan Biaya Pekerjaan Struktur
PeriodicalsCivil & Construction Engineering

Implementasi Building Information Modelling (BIM) 5D Pada Estimasi Volume dan Biaya Pekerjaan Struktur

Checking your access to this record.

Abstract & Overview

The objective of this study is to evaluate the outcomes of cost estimation calculations conducted through the manual approach versus the Building Information Modelling (BIM) approach. BIM addresses the limitations of conventional software like AutoCAD and Microsoft Excel, which are 2D-based and complicate coordination among different engineering fields. BIM, through the integration of 3D (modeling), 4D (scheduling), 5D (cost), 6D (sustainability), and 7D (operation and maintenance), offers a comprehensive framework for project planning, management, and evaluation. This study analyzes the efficiency of volume and cost estimation in the construction of the Balikpapan’s DP3 and DISDAG Building project in the city of Balikpapan using the BIM 5D concept with Autodesk Revit 2022 software. The research results indicate that volume and cost estimations with BIM 5D are more efficient compared to conventional methods. The concrete work volume with BIM is compared to that of conventional methods from the consultant, there is a saving of 4.92% for concrete works, and 5.16% of saving for rebar works. These findings demonstrate that the implementation of BIM 5D in Autodesk Revit is lower and more efficient in volume and cost estimation.

Cite this record

Celvin Adi Prastya, Irna Hendriyani, Reno Pratiwi (2025). Implementasi Building Information Modelling (BIM) 5D Pada Estimasi Volume dan Biaya Pekerjaan Struktur. BANDAR JOURNAL OF CIVIL ENGINEERING. https://doi.org/10.31605/bjce.v7i1.4301

Copy in another style

Prastya, C. A., Hendriyani, I., & Pratiwi, R. (2025). Implementasi Building Information Modelling (BIM) 5D Pada Estimasi Volume dan Biaya Pekerjaan Struktur. BANDAR JOURNAL OF CIVIL ENGINEERING. https://doi.org/10.31605/bjce.v7i1.4301
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.