We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Mechanical Engineering/PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) PEMBANGKIT LISTRIK WASTE HEAT RECOVERY POWER GENERATION (WHRPG)
PeriodicalsMechanical Engineering

PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) PEMBANGKIT LISTRIK WASTE HEAT RECOVERY POWER GENERATION (WHRPG)

Checking your access to this record.

Abstract & Overview

Waste Heat Recovery Power Generation (WHRPG) technology is a produces electrical energy technology that from the flue gas from the operation of a cement factory that releases CO 2 and converts it into electrical energy in the cement industry. Utilization of the generated electricity can be used as a supply of factory electricity needs such as lighting, equipment and various other facilities. Since 2014-2017 until now, the operation of the WHRPG in the Tuban plant after several times setting hot gas on the conversion system is only able to produce an electricity capacity of 28.6 MW which is still far from the planned capacity target, this requires the right operating strategy to reach a capacity of 30.6 MW of electrical energy. Efforts to increase the production capacity of electricity generation from the utilization of hot flue gas in terms of engine performance readiness aspects of steam power plant technology need to be carried out operational and maintenance planning using application method the inspection, small repair medium repair and overhaul (ISMO). Through total productive maintenance (TPM) technical improvements to WHRPG power plant equipment such as damage to pumps and hot gas settings in boilers and other components, repairs are made to get better performance so that the energy produced can reach 95% at the performance ratio value of capacity predetermined start. It is known and can be improved on the OEE (Overall Effectiveness Equipment) value by implementing total productive maintenance on all power generation equipment so that the combination and maintenance together can increase the production of 30.6 MW of electrical energy can be realized.

Cite this record

Farid Mujayyin (2022). PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) PEMBANGKIT LISTRIK WASTE HEAT RECOVERY POWER GENERATION (WHRPG). Nozzle Journal Mechanical Engineering, 11(1), 1–8. https://doi.org/10.30591/nozzle.v11i1.3047

Copy in another style

Mujayyin, F. (2022). PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) PEMBANGKIT LISTRIK WASTE HEAT RECOVERY POWER GENERATION (WHRPG). Nozzle Journal Mechanical Engineering, 11(1), 1–8. https://doi.org/10.30591/nozzle.v11i1.3047
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.