Abstract & Overview
In post deregulated era of power system load characteristics become more erratic.Unplanned transactions of electrical power through transmission lines of particular path may occur due to low cost offered by generating companies.As a consequence those lines driven close to their operating limits and becomes congested as the lines are originally designed for traditional vertically integrated structure of power system.This congestion in transmission lines is unpredictable with deterministic load flow strategy.Rescheduling active and reactive power output of generators is the promising way to manage congestion.In this paper Particle Swarm Optimization (PSO) with varying inertia weight strategy, with two variants e1-PSO and e-2 PSO is applied for optimal solution of active and reactive power rescheduling for managing congestion.The generators sensitivity technique is opted for identifying participating generators for managing congestion.Proposed algorithm is tested on IEEE 30 bus system.Comparison is made between results obtained from proposed techniques to that of results reported in previous literature.