We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Civil & Construction Engineering/Technology Selection For Construction Project, With The Use Of Fuzzy Preference Relation
PeriodicalsCivil & Construction Engineering

Technology Selection For Construction Project, With The Use Of Fuzzy Preference Relation

Checking your access to this record.

Abstract & Overview

Article deals with the problem of technology selection for construction project. Three criteria were proposed: cost, time and technological complexity. To solve the problem, fuzzy preference relations were used. Authors present an algorithm supporting multi-criteria decision-making process. The algorithm creates fuzzy preference relations on the basis of the fuzzy comparison: “xi is better than xj”. Then, with the use of criteria weights it creates general fuzzy preference relation, finds all non-dominated (admissible) alternatives and the best one among them. The algorithm consists of 7 steps. Authors show application of the proposed algorithm - example calculations.

Cite this record

Nabi Ibadov, Jerzy Hubert Rosłon (2015). Technology Selection For Construction Project, With The Use Of Fuzzy Preference Relation. Archives of Civil Engineering, 61(3), 105–118. https://doi.org/10.1515/ace-2015-0028

Copy in another style

Ibadov, N., & Rosłon, J. H. (2015). Technology Selection For Construction Project, With The Use Of Fuzzy Preference Relation. Archives of Civil Engineering, 61(3), 105–118. https://doi.org/10.1515/ace-2015-0028
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.