We use a few cookies

Essential cookies keep the library working. With your permission, we'd also like to use analytics to see what's useful and improve the experience. Read our Privacy Policy or Cookie Policy.

Skip to main content
Home/e-Resources/Mechanical Engineering/BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
PeriodicalsMechanical Engineering

BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY

Checking your access to this record.

Abstract & Overview

Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections after parsing existing problems using Fishbone diagrams.

Cite this record

Ari Andriyas Puji (2022). BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY. Journal of Industrial Engineering and Halal Industries, 3(1), 26–34. https://doi.org/10.14421/jiehis.3501

Copy in another style

Puji, A. A. (2022). BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY. Journal of Industrial Engineering and Halal Industries, 3(1), 26–34. https://doi.org/10.14421/jiehis.3501
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.