Risk management in civil engineering

Checking your access to this record.

Abstract & Overview

Risk is involved in the whole lifecycle of a structure: design, construction, utilization, and demolition. There is a close connection between reliability and risk. Contemporary building codes introduce consideration of reliability in structural design. Here, the concept of risk takes into account the level of consequences of a failure. Structural engineers, who are used to deterministic calculation procedures, are often unfamiliar with the uncertainties associated with risk analysis. An overview of the basic principles of risk management in civil engineering is presented in this paper.

Cite this record

Snežana Mašović, Nenad Pecić, Saša Stošić, Rade Hajdin, Nikola Tanasić (2023). Risk management in civil engineering. Gradjevinski materijali i konstrukcije, 66(2), 115–125. https://doi.org/10.5937/grmk2300003m

Copy in another style

Mašović, S., Pecić, N., Stošić, S., Hajdin, R., & Tanasić, N. (2023). Risk management in civil engineering. Gradjevinski materijali i konstrukcije, 66(2), 115–125. https://doi.org/10.5937/grmk2300003m
Author names are used as deposited, so check their order before you submit.

Metadata is harvested from open-access indexes and can be incomplete. Check a citation against the published version before relying on it — see our open access & attribution policy.