Abstract & Overview
Background. The relevance of the study is due to the increasing demands on the reliability and safety of railway transport. Modern railway automation and telemechanics systems are elaborate technical complexes, the failure of which can lead to significant economic losses and disruption of the movement schedule. Traditional reliability assessment methods based on the analysis of single indicators do not allow for a comprehensive assessment of the condition of such systems. The existing methodological vacuum in the area of integrated assessment of the railway automation and telemechanics availability systems determines the need to develop new approaches that take into account the multi-criteria nature of the task and allow aggregating heterogeneous indicators within a single assessment. Purpose. Methodology development for the integral assessment of the levels of readiness of technical support for railway systems based on mathematical modeling and the Harrington desirability function, which allows for a comparative analysis of railway infrastructure facilities and substantiate management decisions in the area of maintenance and modernization. Materials and methods. The research is based on the application of the Semimarkov process apparatus for modeling the reliability of railway automation and telemechanics systems. The mathematical model includes six system states that take into account various stages of the equipment lifecycle. The Harrington desirability function was used to transform heterogeneous reliability indicators into a single integrated assessment, providing a transition to a dimensionless measurement scale. Results. A method for the integral assessment of the levels of readiness of harvest systems has been developed, combining mathematical modeling based on semi-Markov processes with the transformation of indicators by the Harrington function. An analysis of failure statistics for 2018-2023 revealed a steady downward trend in the number of failures across all categories of equipment. Practical testing of the methodology at ten railway stations made it possible to identify problem areas and determine maintenance priorities. The implementation of the resource allocation algorithm based on game theory has shown the possibility of increasing the efficiency of using funds by 15% compared with uniform allocation. The largest share of resources (47.8%) is appropriate for safety control systems as the most critical for traffic safety. The developed models have shown adequacy in predicting changes in the integral readiness indicator.